Tizit Junior Engineer cautions heavy consumers on power supply issues 

schedule
2025-02-26 | 02:39h
update
2025-02-26 | 04:51h
person
mokokchungtimes.com
domain
mokokchungtimes.com

The Junior Engineer (Electrical) of Tizit, Er James K Ramchem, has issued a circular addressing concerns regarding the overuse of electricity by heavy consumers operating machinery beyond permissible hours. The circular highlights the negative impact of such practices, which include line damage, transformer overloading, and unstable power supply to the general public.

Er Ramchem has specifically urged all workshops, fabrication units, mills, and similar heavy consumers to adhere to strict working hours. During the summer, the designated working hours are from 9:00 AM to 5:00 PM, while in the winter months, the working hours are reduced to 9:00 AM to 4:00 PM.

Failure to comply with these regulations will result in penalties, including fines or the possibility of being barred from receiving further load sanctions, as deemed appropriate by the competent authority.

MT

Related Posts:

Advertisement

Advertisement

Imprint
Responsible for the content:
mokokchungtimes.com
Privacy & Terms of Use:
mokokchungtimes.com
Mobile website via:
WordPress AMP Plugin
Last AMPHTML update:
25.07.2025 - 04:02:36
Privacy-Data & cookie usage: